Fabien is building his Pro Vee in France. Photos on this page originally appeared on his blog.
Here are bulkheads one and two.
|
|
Bulkheads three and four and the stem.
|
|
Dry assembly to test the fit.
|
|
Assembly.
|
|
|
|
|
|
Beginning the bottom planking.
|
|
Planking trimmed and glued.
|
|
Hull turned over, the interior painted.
|
|
Adding foam flotation and the first pieces of decking.
|
|
Upside down again, adding the second layer of bottom plywood.
|
|
Cutting fiberglass for the bottom.
|
|
Wetting out the fabric.
|
|
Completing the fiberglass bottom.
|
|
|
|
Right side up again, ready to continue with the decking.
|
|
|
|
Scraps of foam are added to the forward spaces.
|
|
|
|
|
|
Completing the foredeck.
|
|
|
|
Framing the front cowling.
|
|
|
|
Here Fabien is using foam between layers of plywood.
|
|
|
|
Purchase Pro Vee plans
|
|
|
Return to Customer Boats
|